Demo build. The production version matches BOM lines against an equipment library (specs, vendors, lead-time data) and manages the RFQ → quote → PO lifecycle. This page demonstrates the flow on Meridian's modeled BOM: pick vendors, draft an RFQ, advance the status.
The BOM arrives from Meridian's Build tab ("Send BOM to Procurement"). Quantities and specs are modeled, pre-engineering — the RFQ marks them "confirm at award".
01BILL OF MATERIALSmodeled equipment list — click vendors to shortlist, then draft the RFQ
Flow: BOM line → shortlist vendors from the library → Draft RFQ (printable, per line) → mark Sent → Quoted → PO issued. Click a status pill to advance it. Long-lead critical-path items (MV switchgear, transformers) should go out first.
| Qty | Item | Spec | Lead | Vendor shortlist — from library | Status | |